The Second Floor Takes Shape
Most of the posts have been prepared and the main central beam is in place. This past week Colin and Leslie have had a baby daughter. Work will continue in the new year.

   
  December 23 , 2000 - Claire in the foreground and Leigh up on the second floor. The car is parked where the car port will go eventually.  
   
  December 23, 2000 - The second floor central beam is in place. Leigh stands in what will be a bedroom on the second floor. The view to the south is gorgeous.  
   
  December 23, 2000 - Leigh stands in the spare bedroom on the far west side of the second floor. The first post on the south side of the second floor shows where the last row of posts will go.
   
  December 23, 2000 - Leigh stands in the spare bedroom on the far west side of the second floor. The first post on the south side of the second floor shows where the last row of posts will go.  
   
  December 23, 2000 - Looking south through the post and beam construction. Leigh surveys the second floor while Ian and Claire play in the snow to the left. The sun shines down through the site.  
   
  December 23, 2000 - Looking up at the new second floor from deep south on the property.  
   
   
     